Joined
·
11 Posts
not spain, but regulation for new buildings oblige to have three phase input installation. I've one phase only, but I can move to three phase just paying the connection to the pole. e.g. three phase already arrive almost everywhere, just need a new connection.In the EU, almost all homes have 3-phase power by default!