DIY Electric Car Forums banner
1 - 1 of 16 Posts

· Registered
Joined
·
57 Posts
I am interested in a similar project. In the rental generator market, we need flexible battery packs that can be delivered based on the need of the site. One client may want 50kW x 150kWh and another client may need the same three packs arranges in a 150kW x 150kWh. A modular system of building blocks is desirable. Think of it as the Spark charge Roadie scaled up 10 times the size of each Roadie module.
 
1 - 1 of 16 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top