Joined
·
207 Posts
Finally, after cajoling the machinist for a month, I finally got my connector between the motor and trans. I do have to hand it to Jon at Portland Manufacturing, he did a great job fabricating this connector it fit like a glove, and after assembling the motor and trans. It ran like a dream. The bench test was 100% successful, I could discern no grinding bearing noises, or binding in the coupling. Now I’m ready to install it in electric red this weekend that should conclude phase 2 ( the mechanical refit) and I should be able to blaze through the electrical, and battery phase. Patience is everything.
Attachments
-
83.8 KB Views: 512
-
47.9 KB Views: 450
-
83.6 KB Views: 470
-
87.7 KB Views: 467
-
56.1 KB Views: 499