Joined
·
68 Posts
A picture says a million words -
in this case it rendered me speechless -
As I had written before, I`m waiting now close to 6 month to receive parts to get my ep junior controller repaired.
I received another mail from Mr. Paul Zigouras, stating the parts are on the way, and an installation guide to assemble the now new and impoved genuine Zigouras engineering circuit.
I did ask about the purpose of the fuses on the gate, the answer was:
"They`ll protect the electronics"
Don`t any body say, there`s no protection circuitry in epc industrial controllers!
Could it be EPC`s New Year Joke? Can someone ask please?
Btw, sofar I did`t receive any parts nor a tracing number.
in this case it rendered me speechless -
As I had written before, I`m waiting now close to 6 month to receive parts to get my ep junior controller repaired.
I received another mail from Mr. Paul Zigouras, stating the parts are on the way, and an installation guide to assemble the now new and impoved genuine Zigouras engineering circuit.
I did ask about the purpose of the fuses on the gate, the answer was:
"They`ll protect the electronics"
Don`t any body say, there`s no protection circuitry in epc industrial controllers!
Could it be EPC`s New Year Joke? Can someone ask please?
Btw, sofar I did`t receive any parts nor a tracing number.
Attachments
-
89.2 KB Views: 316